My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-01_INSPECTION - M1995095
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1995095
>
2015-04-01_INSPECTION - M1995095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:50 PM
Creation date
4/2/2015 8:45:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995095
IBM Index Class Name
INSPECTION
Doc Date
4/1/2015
Doc Name
Inspection Report
From
DRMS
To
Schuler Terracing
Inspection Date
3/18/2015
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Cost Summar <br />Site: Simla Highway Pit Permit Action: AR -01 <br />PROJECT IDENTIFICATION <br />Task #: R00 State: Colorado <br />Date: 4/1/2015 County: El Paso <br />User: TC 1 <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job #: M1995095 <br />Abbreviation: None <br />Filename: M095 -R00 <br />Task <br />Descri tion <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />Rla <br />R20 <br />R30 <br />R40 <br />Misc Grading (10' high working face, 100' long) <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />0.90 <br />$188.00 <br />$4,738.00 <br />$15,522.00 <br />$3,589.00 <br />Topsoil Placement (6" depth over 7.59 ac) <br />SCRAPERI <br />18.59 <br />Revege 7.59 acres <br />REVEGE <br />30.00 <br />Mob/Demob <br />MOBILIZE <br />2.96 <br />SUBTOTALS: <br />52.45 <br />$24,037 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />0.00 hrs <br />Profit: <br />10.00% <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 <br />Engineering work and/or contract/bid preparation: 0.00% <br />Reclamation management and /or administration: 5.00% $1,358.93 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $4,500.57 <br />TOTAL BOND AMOUNT (direct + indirect) = $28,537.57 <br />$485.55 <br />$252.39 <br />$0.00 <br />$2,403.70 <br />$3,141.64 <br />$27,178.64 <br />Total = 0.00 <br />Total = $0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.