Laserfiche WebLink
Scraper Worksheet Cont'd Task # R20 Page 1 of 2 <br />SCRAPER TEAM WORK <br />Task description: Topsoil Placement (6" depth over 7.59 ac) <br />Site: Simla Highway Pit Permit Action: AR -01 Permit/Job #: M1995095 <br />PROJECT IDENTIFICATION <br />Task #: R20 State: Colorado <br />Date: 4/1/2015 County: El Paso <br />User: TC 1 <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 623G <br />- Dozer: NA <br />Abbreviation: None <br />Filename: M095 -R20 <br />COSTShift basis: 1 per day <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Scraner Work Team Support Eauipment Maintenance Equipment <br />Total work team cost/hour: $254.83 <br />MATERIAL OUANTITIES <br />Initial volume: 6,123 CCY Swell factor: 1.115 <br />Loose volume: 6,827 LCY <br />Source of estimated volume: AM -01 Exh D subtracting Google Earth 1.13 -ac Sed Pond <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$75.81 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$140.00 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$39.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$254.83 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$254.83 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $254.83 <br />MATERIAL OUANTITIES <br />Initial volume: 6,123 CCY Swell factor: 1.115 <br />Loose volume: 6,827 LCY <br />Source of estimated volume: AM -01 Exh D subtracting Google Earth 1.13 -ac Sed Pond <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,100 lbs /LCY <br />Material description: <br />Earth - Loam <br />Rated Payload: <br />55,200 pounds <br />Payload Capacity: <br />26.29 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />18.00 <br />LCY <br />Heaped Volume: <br />23.00 <br />LCY <br />Average Volume: <br />20.50 <br />LCY <br />Adjusted Capacity: <br />20.50 <br />LCY <br />CIRCES Cost Estimating Software <br />