Laserfiche WebLink
i — ` Current Affected Land Involved in <br />Mining Operation, exclusive of <br />% reclamation areas (64 acres). <br />Previously Affected Land that <br />�■ <br />■ o � is now reclaimed and released land. <br />I, (about 165 acres on this ma + other land <br />\ ( elsewhere) <br />\ Affected Land currently <br />\ L <br />_ a; _ - - being reclaimed, but <br />\ C _ _ not yet released from bond (about 32 acres) . <br />/ - Future Mining Area <br />(approx 32 acres maximum) <br />■ <br />Backfilling and /or Grading <br />(3.9 acres) <br />/O <br />0 <br />m - 101915,- o� <br />RECEIVED <br />'0 <br />k. -� 01 2015 <br />LAND BETWEEN MINING AREA AND <br />■ ADJACENT POWER LINE AND DIVISION OF RECLAMATION <br />OWA APPROVED FOR USEYNOT MINING AND SAFETY <br />SEE "VERY IMPORTANT NOTE" ON <br />PAGE 7 OF EXHIBIT D. <br />O ■ <br />■ ■ ■ ■ ■ <br />0 1 ■ <br />elirl ------------- <br />-- -- ---------- L 50' <br />cT3 <br />o l <br />■ <br />C <br />4 I Backfill and / <br />30 \ 59 1 rad% <br />\ Top oil SA <br />y Sto kpile t7►oOWel <br />3 ad <br />�o °° _C)o <br />a' it /Gas <br />°' ,�� O ` <br />ell Exclusion <br />■ ■ NEW PERMIT BOUNDARY <br />Current Lease Boundary <br />5th Amendment (860 acres) <br />NN <br />N <br />1 = 600' <br />True North <br />A Magnetic <br />North (10.1 E) <br />0 500 1000 <br />2015 Annual Report <br />DETAIL <br />MAP <br />By MAH base date: Jan'05 March 2015 <br />modified io March 2015 <br />to adjust for TR -07 <br />