Laserfiche WebLink
March 24, 2015 C- 1996 - 083 /13owie No. 2 Mine JDM <br />Gob Pile 93 To soil Stock He F/F1 and Coverfill Stockpile <br />Y <br />i <br />✓' r� - 7 <br />.r <br />Pooled Water on Gob Pile 43 <br />Gob Pile #4 <br />Reclamation of the west side of Gob Pile #4 is completed. Cover material is placed on the three lower benches <br />that have been backfilled and graded to final configuration. The upper bench remains open for additional refuse <br />placement. Topsoil has been placed and erosion control mat is in place. A small amount of vegetative growth was <br />observed on the pile at the time of the inspection. <br />Gob Pile #4 Reclamation <br />Number of Partial Inspection this Fiscal Year: 11 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 8 of 11 <br />