Laserfiche WebLink
RECEIVED <br />JAN 2 '12015 <br />DIVI.S101 a •. ' , gt!C;t lMATION <br />MINING €;i SAFE Y- MINERAC6 <br />FEE REPORT MAP• FW <br />112c Annual Report <br />Page 2 of 3 <br />Permittee Name: <br />Oldcastle SW Group, Inc. <br />dba United Companies of <br />Mesa County <br />Permit Number. <br />M-2002-094 <br />Operation Name: <br />Allen Pit <br />County: <br />Montrose <br />Annual Fee'Due: <br />$791.00 <br />Ann. ers Date: <br />January 23, 2015 <br />Permit Acreage: <br />151.50 <br />Current Bond Amt: <br />$72,400.00 <br />According to C.R.S. 34 -32.5 -116 or 34- 32 -11,¢, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Repot and Map showing the extent of current disturbances to affected land, required <br />monitoring.information, reclamation accompli$hed to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />in wtioh of the site. A while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. <br />Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />YES NO <br />2. <br />Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />NO <br />3. <br />Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? <br />YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />Topsoil <br />2013 <br />4. <br />What was the date of last excavation, processing or hauling activity at the mine? <br />5. <br />Does the mine operate more than 180 days per year? <br />YES NO <br />Q <br />If "NO", please review Rule 1.13 to assume that your mine is in compliance. <br />6. <br />Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />YES <br />b) approval for OPERATXON? <br />YES NO <br />7. <br />Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />Seed <br />application <br />8. <br />Number of acres that were newly affected during the current report year. <br />` <br />�j/i�} <br />9.' <br />Number of acres that were reclaimed during the current report year. <br />method: <br />10. <br />Estimated new acreage to be affected in the next report year. <br />d <br />11. <br />Estimated acres to be reclaimed in the next report year. <br />12. <br />Total acres in various stages of reclamation, since permitted mining activities began:. <br />Total acres <br />backfilled: <br />0 <br />Total acres <br />seeded w/ <br />approved mix' <br />Q <br />T6tal acres <br />w /topsoil <br />• <br />laced• <br />O <br />Total acres <br />mulched w/ <br />roved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />fertilized w/ <br />replacement <br />Q <br />rate (tons/ac): <br />a vd fertilizer: <br />depth (in.): <br />Seed <br />application <br />/J /�} <br />Fertilizer <br />application <br />` <br />�j/i�} <br />Mulch <br />application <br />014 <br />method: <br />method: <br />method: <br />