My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-31_HYDROLOGY - M1999050
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1999050
>
2015-03-31_HYDROLOGY - M1999050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 1:48:06 PM
Creation date
4/1/2015 9:15:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999050
IBM Index Class Name
HYDROLOGY
Doc Date
3/31/2015
Doc Name Note
April 1, 2015 through March 31, 2016
Doc Name
Substitute Water Supply Plan April 1, 2015 through March 31, 2016
From
DNR Water Resources
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Todd Williams, P.E. Page 6 of 6 <br />March 24, 2 ,15 <br />21. This substitute water supply plan may be revoked or modified at any time should it be <br />determined that injury to other vested water rights has or will occur as a result of this plan. <br />Should this substitute water supply plan expire without renewal or be revoked prior to <br />adjudication of a permanent plan for augmentation, all excavation of product from below the <br />water table, and all other use of water at the pit, must cease immediately <br />22. In accordance with amendments to 5 25 -8- 202(7), C.R.S., and "Senate Bill 89 -181 Rules and <br />Regulations" adopted on February 4, 1992, the State Engineer shall determine whether the <br />substitute supply is of a quality to meet requirements of use to which the senior appropriators <br />receiving the substitute supply has normally been put. As such, water quality data or analysis <br />may be requested at any time to determine if the requirement of use of the senior <br />appropriator is met. <br />23. The decision of the state engineer shall have no precedential or evidentiary force, shall not <br />create any presumptions, shift the burden of proof, or serve as a defense in any pending <br />water court case or any other legal action that may be initiated concerning this plan. This <br />decision shall not bind the state engineer to act in a similar manner in any other applications <br />involving other plans, or in any proposed renewal of this plan, and shall not imply <br />concurrence with any findings of fact or conclusions of law contained herein, or with the <br />engineering methodologies used by the Applicant. <br />Should you have any questions or comments, please contact Michael Hein in Greeley at 970- <br />352 -8712 or loana Comaniciu in Denver at 303 - 866 -3581. <br />Cc: NO <br />810 <br />Sincerely, <br />Jeff at rage, P. E. <br />Chief o ater Supply <br />Tables 1, 2, 4 and Water Balance <br />Augmentation Plan Accounting, Dry-Up of Irrigated Land, and Recharge <br />Administrative Protocols <br />I. Hein, Assistant Division Engineer, Michael. HeinCstate.co.us <br />Street, Suite 200, Greeley, CO 80631, (970) 352 -8712 <br />Simpson, Water Commissioner, Water District 3, Mark.Simpson@state.co.us <br />Division of Reclamation, Mining and Safety <br />JD /TLK /idc: Timnath- Connell 2015 -16 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.