My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-31_HYDROLOGY - M1999050
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1999050
>
2015-03-31_HYDROLOGY - M1999050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 1:48:06 PM
Creation date
4/1/2015 9:15:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999050
IBM Index Class Name
HYDROLOGY
Doc Date
3/31/2015
Doc Name Note
April 1, 2015 through March 31, 2016
Doc Name
Substitute Water Supply Plan April 1, 2015 through March 31, 2016
From
DNR Water Resources
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thy <br />of <br />ADMINISTRATION PROTOCOL <br />Recharge <br />Division One — South Platte River <br />purpose of a "recharge structure" as referenced in this document is to introduce <br />;r to the river alluvium that will result in accretions to a live stream. For the purposes <br />is document, a recharge structure does not include a well that is used to artificially — <br />recnarge a Denver Basin bedrock aquifer. With that qualification, a recharge structure is <br />defined as: <br />■ A section of ditch, the losses from which can be reasonably modeled as a <br />single source of water. <br />■ A pond or group of ponds that receive water from the same delivery location <br />and can be reasonably modeled as a single source of water. <br />1. A written notification for each recharge structure must be provided to the water <br />commissioner and division engineer. The Division of Water Resources will <br />not acknowledge any recharge activity conducted without the knowledge of <br />the water commissioner. The notification must include: <br />a. a map showing the location of the structure and the court case number of <br />the plan for augmentation authorized to use the structure; <br />b. a map showing the location of the diversion point and the court case <br />number for the decree authorizing the diversion, if any; <br />c. a map showing the location of and all information for the metering <br />location; <br />d. the maximum water surface area of the structure; <br />e. for ditch structures, if the ditch is divided into more than one recharge <br />reach, an explanation of how the volume diverted will be allocated to the <br />various sections. <br />2. Upon receiving written notification or decree by the water court, the division <br />engineer will assign the structure a WDID number. The WDID number is the <br />identification number that will be used for the administration of the structure and <br />must be included in all correspondence and accounting reports. (For structures <br />that were included in a decreed plan for augmentation but were not <br />physically constructed at the time of the decree, a written notification of the <br />intent to construct the structure must be provided.) <br />3. Any structure that intercepts groundwater must be permitted as a well and <br />included in a plan for augmentation or substitute water supply plan approved by <br />the state engineer. The division engineer strongly recommends avoiding <br />recharge structures that intercept groundwater, in order to simplify the accounting <br />process. <br />4. The flow into EVERY recharge structure MUST be metered and equipped with a <br />continuous flow recorder unless the water commissioner in conjunction with the <br />division engineer determines adequate records may be kept without such <br />equipment. If the recharge structure is designed to discharge water via a surface <br />outlet, such discharge must also be metered and equipped with a continuous <br />flow recorder. The water commissioner MUST approve the use of the recharge <br />structure BEFORE any credit will be given for water placed into recharge. <br />Administration Protocol : Recharge <br />Revised February 1, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.