Laserfiche WebLink
SEDIMENTATION POND SURVEYS <br />SCC is required by Permit C -82 -057 to monitor sedimentation ponds for sediment storage <br />capacities. In accordance with Rule 4.05.6(11)(c), SCC visually inspects each pond a <br />minimum of quarterly each year. During these inspections, any drastic change in <br />sedimentation storage or sudden increase in a sediment delta at the inlet to the pond could be <br />detected which would require mitigation. <br />Based on the 2014 survey, all sediment ponds have sufficient sediment storage. Additionally, <br />all ponds have been discharging in compliance with the approved NPDES permit effluent <br />limitations. Yearly sediment delivery estimates to the ponds are considerably less than <br />originally calculated, since significant portions of these watersheds have now been <br />revegetated. The results of the annual survey are shown on Table 13.3, Sediment Pond <br />Capacities. <br />TABLE 13.3 SENECA SEDIMENT <br />PONDS -WATER <br />CAPACITY TRENDS <br />P-: <br />MMAMEFC--t <br />YEAR <br />2008 <br />2009 <br />Remaining W <br />2010 2011 <br />2012 <br />2013 2014 <br />FDecision <br />Y - 016 <br />3.68 <br />7.6 <br />-.6 <br />-.8 <br />8 <br />8 <br />- . - <br />9.2 <br />TTt -3 <br />Y - 611 <br />6.99 <br />3.6 <br />3.6 <br />3.6 <br />3.6 <br />3.6 <br />3.- <br />3.6 <br />TR -37 <br />Y - 0112k <br />0.633 <br />NA <br />NA <br />-NA <br />NA <br />N A <br />NA <br />TtiA <br />TR -37 <br />Y-012 <br />0. -6- <br />0.7 <br />0.- <br />1.1 <br />6.83 <br />1.2 <br />1.3 <br />13 <br />T 3- <br />Y -012A <br />63 <br />63 <br />6.1 <br />3.6 <br />5 <br />4.6 <br />4.4 <br />* - 013 <br />1.325 <br />45 <br />4.4 <br />4.5 <br />4.4 <br />43 <br />4.5 <br />4.5 <br />TR -37 <br />Y -614 <br />1.6 <br />10.5 <br />7.5 <br />7.6 <br />-- <br />75 <br />7.5 <br />TR -37 <br />?Iel -d -'3 2� j- <br />4 Baud on SIEDCAD rrrxhsfora 1Oyr- /24 hr storm Btwd <br />�Z} l�ffNtlt CCl�QCf�" �Plb1l��T78l�d {d�}' PY OTS�d <br />{3� Tip -37, .page 13 -4.9. P A9 {dfock powd) <br />STOCK TANKS & SURGE CONTROL STRUCTURES <br />No stock tanks or surge control structures were constructed in 2014. <br />8 <br />