Laserfiche WebLink
Peabo�q <br />Peabody Colorado Operations, LLC <br />March 30, 2015 <br />Ms. Janet Binns <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 -2273 <br />Hayden Gulch Terminal, LLC. <br />Peabody Energy <br />PO Box 670 <br />Hayden, CO 81639 <br />970 - 276 -7016 <br />RE: Hayden Gulch Terminal Loadout, Permit C -92 -081, Annual Hydrology Report <br />Dear Ms. Binns, <br />Enclosed please find one electronic copy of the 2014 Annual Hydrology Report for the <br />Hayden Gulch Terminal Loadout. This report contains a compilation and analysis of all <br />hydrologic data collected in 2013. <br />Please contact me at 970 - 276 -7009 if you or any other members of the Division have any <br />questions or wish to discuss the report. <br />Sincerely, <br />Katryna Snowden <br />Enclosures <br />C: Alan Boehms, OSMRE, Denver <br />Jennifer Maiolo, BLM, Craig <br />