Laserfiche WebLink
COLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Natural Resources <br />23 March 2015 <br />To: Brock Bowles <br />From: Robin Reilley <br />Re: RE: New Horizon Mine (C1981 -008) <br />Technical Revision TR 67 <br />Dear Brock, <br />I was asked to review the New Horizon Mine Technical Revision 67 which is incorporating the restoration <br />plan of the BB Road west of 27.00 Road as approved by Montrose County and an update of the as -built <br />drawing for Pond 008. <br />Rules: 2.05.3 -(4), 4.03 -(4), 4.05.6, 4.05.9- (2)b,c Sediment Ponds: <br />1. The proposed as -built Map 2.05.3(3) -4 -2) shows a storage capacity of 0.063 AC /FT at elevation <br />5647.0 ft (bottom of pond) while the sedcad of March 2006 shows 0.00 ac /ft at the same <br />elevation. Please clarify the proper storage capacity at the 5647.0 ft elevation for Pond 8. <br />2. Regarding the update of the as -built drawing of Pond 008, the Map 2.05.3(3) -4 -2 shows the <br />drainage area to be 102.9 acres but the sedcad was run using 110.436 AC (Attach men tments <br />2.05.3(3) -4 -2 and 2.05.3(3) -4 -4). Please clarify the proper acreage for the drainage basin for <br />Pond 8. <br />In Attachmentments 2.05.3(3) -4 -2 and 2.05.3(3) -4 -4 of the approved permit, the units are <br />inconsistent across the two analysis. The inconsistencies are in total area (AC vs SQ FT), gross <br />erosion, total yeild, run -off volume, sediment volume and total volume. The Division cannot <br />complete its review of the culvert change for Pond 8 with the curently approved sedcad runs. <br />Please make units consistent across the input and output datasets in Attachmentments <br />2.05.3(3) -4 -2 and 2.05.3(3) -4 -4 and re- submit the sedcad runs of the Pond Volume <br />Calculations for both the 10 and 25 year 24 hour events. <br />4. At the bottom of MAP 2.05.3(3) -4 -2, Exhibit 2.05.2 -18 is referrenced for more detail about the <br />discharge structure of Pond 8. The Division was not able to located Exhibit 2.05.2 -18 in the <br />permit but was able to review the discharge structure on Map 2.05.3(3) -4 -3. Please clarify the <br />correct drainage structure detail map for Pond 8 on Map 2.05.3(3)4 -2. <br />5. With regards to the restoration of the BB Road west of 27.00 road sedcad analysis by the Division <br />indicated that the proposed restoration was consistent with Rules 2.05.3 -(3)c Operation Plan, 4.03 -(4) <br />Roads; and that the designs were consistent with the 10 and 24 year 24 hour events. <br />Sincerely, <br />of coLO� <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http: / /mining.state.co.us I ryes o`N <br />John W. Hickenlooper, Governor I Mike King, Executive Director I Virginia Brannon, Director <br />* I87_6 <br />