Laserfiche WebLink
1. Does it appear that the emergency spillway has discharged water since the last inspection? <br />YES NO x <br />2. Is erosion occurring at any section of the emergency spillway? <br />YES NO x <br />SEDMIMENT STORAGE CAPACITY <br />-1. Has the design storage capacity of the reservoir been surpassed? <br />YES NO x <br />Explain: <br />OTHER OBSERVATIONS <br />Pond 5 had one small pool of water and is working order at the time of the inspection. <br />CERTIFIED IMPOUNDMENT INSPECTOR <br />3- ag- ao <br />DATE <br />Page 2 of 2 <br />