My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-17_GENERAL DOCUMENTS - P2011006
DRMS
>
Day Forward
>
General Documents
>
Prospect
>
P2011006
>
2015-03-17_GENERAL DOCUMENTS - P2011006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:27 PM
Creation date
3/30/2015 2:46:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011006
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
3/17/2015
Doc Name
Permit denial
From
Joseph L. Dorris
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Personnel may came on. or near the site All nnel will practice min• a imm c ping <br />All refuse will be removed from site to a sanitary landfill._ <br />Personnel will leave the site daily to take care of pqrsonal sanitation needs o&uwi_se human <br />waste will be disposed by following the "Leave No Trace" aaidelines A portable restroom will also <br />be brought to a nearby site Between active oplofion phases, path ng will remain on site The site <br />will be clean. Nothing will be present nor sto <br />V ENVIRONMENTAL PROTECTIONMEASURES (SEE 36 CFR 228.8) <br />A. Air Quality. Describe measures proposed to minimize impacts on air quality such as obtaining a <br />burning permit for slash disposal or dust abatement on roads. <br />Impact will be minimal No slash will be burned No open foes will be used <br />No haulage will occur. Due to the nature of theitic soil and small excavations no Significant <br />dust is generated After the first foot of topsoil is lqMMMd and piled. generated dust is minimal <br />the deepwgranitic soils are damp and do not erate much dust. <br />Daiiv travel will amount to about 15 days per year for two vehicles during active mining operations <br />uipment will be roaded in once and removed once unless brouh m for a second time to complete <br />reclamation. <br />B. Water Quality. State how applicable state and federal water quality standards will be met. <br />Describe measures or management practices to be used to minimize water quality impacts and <br />meet applicable standards. <br />L State whether water is to be used in the operation, and describe the quantity, source, methods <br />and design of diversions, storage, use, disposal, and treatment facilities. Include assumptions for <br />sizing water conveyance or storage facilities <br />2. Describe methods to control erosion and surface water runoff from all disturbed areas, including <br />waste and tailings dumps. <br />3. Describe proposed surface water and groundwater quality monitoring, if required, to <br />demonstrate compliance with federal or state water quality standards. <br />4. Describe the measures to be used to minimize potential water quality impacts during seasonal <br />closures, or for a temporary cessation of operations. <br />S. If land application is proposed for waste water disposal, the location and operation of the land <br />application system must be described. Also describe how vegetation, soil, and surface and <br />groundwater quality will be protected if land application is used. <br />No wastewater is produced nor is any yxmiabla amounts of water used in this operation <br />A Maximum of 20 8d1ow of water. hr—o-u& in from off site, will-be help s i <br />extraction and cleaning. Cleaning is used only to remove mud or to reveal crystal pockets <br />No runoff is produced All rain is quickly absorbed into the excavations or small pits.^� <br />All dd"g water is broughl in from off <br />Excavations are not located near any open water or intermittent streams None will penetrate the <br />water- tabl_ a at any gQ nt All cite well above and away from wet lands. �'- <br />Excavattons will be b med. as needed. to prevent runoff during vy rain <br />cavations on slopes exceeding g S iestrees will have silt fencing to further pm nt any erosion;, <br />Rf more space is needed to fill out a block of infonnadon, use additional sheers and attach m fors) <br />C. Solid Wastes. Describe the quantity and the physical and chemical characteristics of solid <br />waste produced by the operation. Describe how the wastes will be disposed of including <br />location and design of facilities, or treated so as to minimize adverse impacts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.