Laserfiche WebLink
D. Name, address and phone number of any other lessees, assigns, agents, etc., and briefly describe their <br />involvement with the operation, if applicable: <br />IV. DESCRIPTION OF THE OPERATION <br />A. Access. Show on a map (USGS quadrangle map or a National Forest map, for example) the <br />claim boundaries, if applicable, and all access needs such as roads and trails, on and off the <br />claim. Specify which Forest Service roads will be used, where maintenance or reconstruction is <br />proposed, and where new construction is necessary. For new construction, include construction <br />specifications such as widths, grades, etc., location and size of culverts, describe maintenance <br />plans, and the type and size of vehicles and equipment that will use the access routes. <br />Sgre attached USGS map All access is by established 4WD roads F S Rd 20106mary Rd 752 <br />Rd 753, Rd 754. and Rd 752A. All access to rospect sites within 4t)p is IyI".. <br />•„ <br />machinery. Service trucl g will be left on ostablo ed 4WD roads. There will be no new construc- <br />a . A John Deere 690 or 992 track hoe will be using the access AdditioW <br />ty standard 4WD <br />onvate trucks will be used. Excavation anti reclamation will be accomplished with the fro, lchr� <br />1 XT7T ;_ =@ 1 / �1 - <br />(If NWre space h needed to JW out a block of information, use addMonal sheets and attack to form) <br />M. PROPERTYORAREA <br />Name of claim, if applicable, and the legal land description where the operation will be located. <br />MC# <br />242083 <br />422 0— 094 ---- <br />X42085 i <br />242086 <br />242087 <br />242088 `� <br />Name <br />Four Point <br />HifP <br />Silver Microcline <br />S gar <br />Suzie Blue <br />;Three Point <br />Section <br />11 <br />10 & 11 <br />10 <br />_LCL_ <br />_ 02 <br />11 <br />Township <br />– .�— <br />12 S <br />12 S _ <br />_ 12S <br />1 S <br />12S _ <br />Range <br />71W <br />71 W <br />71 W <br />1 W <br />7 W <br />� 1 <br />71 W 4 <br />IV. DESCRIPTION OF THE OPERATION <br />A. Access. Show on a map (USGS quadrangle map or a National Forest map, for example) the <br />claim boundaries, if applicable, and all access needs such as roads and trails, on and off the <br />claim. Specify which Forest Service roads will be used, where maintenance or reconstruction is <br />proposed, and where new construction is necessary. For new construction, include construction <br />specifications such as widths, grades, etc., location and size of culverts, describe maintenance <br />plans, and the type and size of vehicles and equipment that will use the access routes. <br />Sgre attached USGS map All access is by established 4WD roads F S Rd 20106mary Rd 752 <br />Rd 753, Rd 754. and Rd 752A. All access to rospect sites within 4t)p is IyI".. <br />•„ <br />machinery. Service trucl g will be left on ostablo ed 4WD roads. There will be no new construc- <br />a . A John Deere 690 or 992 track hoe will be using the access AdditioW <br />ty standard 4WD <br />onvate trucks will be used. Excavation anti reclamation will be accomplished with the fro, lchr� <br />1 XT7T ;_ =@ 1 / �1 - <br />(If NWre space h needed to JW out a block of information, use addMonal sheets and attack to form) <br />