My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-17_GENERAL DOCUMENTS - P2011006
DRMS
>
Day Forward
>
General Documents
>
Prospect
>
P2011006
>
2015-03-17_GENERAL DOCUMENTS - P2011006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:27 PM
Creation date
3/30/2015 2:46:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011006
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
3/17/2015
Doc Name
Permit denial
From
Joseph L. Dorris
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(signingtiabeling), or other special operations requirements necessary to conduct the proposed <br />operations. <br />Diesel fuel is transported in an approved 50- gallon tank which is allached to the truck. <br />Refilelmg takes place approxim�tely_gyery other day. <br />3. Describe the measures to be taken for release of a reportable quantity of a hazardous material or <br />the release of a toxic substance. This includes plans for spill prevention, containment, <br />notification, and cleanup. <br />There will be no release of toxic maAodal s due to this oRmWon <br />Additionally the mined substances do not produce any toxic substances <br />Should we have an accidental Will of diesel fuel we will follow ls pill re,_pDrrtma rule as outlines_ <br />by the State Division of Red m ation. Mining, and Safety dated 2 Au_�,ct3pp5 This includes <br />ludes <br />no <br />ft& the division and the South Park District. It treatin <br />includes it with aeration and <br />Wroducing oil—de oil-de&Mft bacteria. <br />H. Reclamation. Describe the annual and final reclamation standards based on the anticipated <br />schedule for construction, operations, and project closure. Include such items as the removal of <br />structures and facilities including bridges and culverts, a revegetation plan, permanent <br />containment of mine tailings, waste, or sludges which pose a threat of a release into the <br />environment, closing ponds and eliminating standing water, a final surface shaping plan, and <br />post operations monitoring and maintenance plans. <br />Each nros�t wilt be closed and reclaimed as soon as aa:hle after der oMin_Bmuse this is a <br />prospecting operation. any prospects opened during the season will be closed. recontoured. and <br />reseeded during the season in which they are opened Silt fencing i(f any) will remain in place until <br />80' /o recovery is achieved S cifically each excavation will be refilled with the stored waste rock <br />and mgKdgSL The re ontouring will be left rough to aid in trapping seed and eliminat ng any pgs- <br />sible erosion Stored topsoil will then be spread and the RgWld will be reseeded using the South Park <br />District's approved di3&wer elevation seed mbL Ail sites will be monitored annually for growth. If <br />_— ma rechwati-on <br />bet should not successful for env given site, the process will be MRMged until 80% cov- <br />or achieved. <br />All heave -traffic areas walk -ways for equipment. non - system roads. wor ing p cnp sites and <br />any other d Uwted aiP will also be reclaimed in a like fashion Additionally all pre- existing a d <br />due pits. trenches. and excavations within the imm a area of operating will also be reclaimed <br />VI. FORESTSERVICEEVALUATIONOFPL ANOFOPERATIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.