Laserfiche WebLink
i <br />-2- <br />10. Primary Mine Entrance Location (report in either Latitude/Longitude OR UTM): <br />i <br />Latitude/Longitude: <br />Example: (N) 1 39° 44' 12.98" <br />(Vi) j 104° 59' 3.87" <br />Latitude (N): deg 39 min 17 sec 35 99 (2 decimal places) <br />Longitude (W): 'deg 102 min _44_ sec 01 . 47 (2 decimal places) <br />OR <br />Example: (l) ! 39.736910 <br />(W) 1- 104.98449° <br />Latitude (N) <br />(5 decimal places) <br />Longitude(W) 1 (5 decimal places) <br />OR 11 <br />Universal Tranverse Mercator (UTM) <br />1 <br />Example: , 201336.3 E NAD27, <br />Zone 13 <br />43983`51.2 N <br />UTM Datum (specify NAD27, NAD83 WGS 84) Nad 83 <br />12 <br />or <br />Zone <br />Easting <br />Northing <br />11. Primary Future (Post - mining) <br />Land Use (check only one): <br />® Cropland(CR) <br />® Pastureland(PL) <br />® General Agriculture(GA) <br />X Rangeland(RL) <br />® Forestry(FR) <br />® Wildlife Habitat(WL) <br />® Resid Intial(RS) <br />i <br />® Recreation(RC) <br />® Industrial/Commercial(IC) <br />12. <br />13 <br />® Developed Water Resources(WR) <br />® Cropl f d(CR) ®Pastureland(PL) <br />U Rangeiand(RL) ® Forestry(FR) <br />® Residefntial(RS) n Recreation(RC) <br />® Developed Water Resources(WR) <br />of <br />13.1 Estimated completion date of contract: <br />® Solid Waste Disposal(WD) <br />® General Agriculture(GA) <br />® Wildlife Habitat(WL) <br />n Industrial /Commercial(IC) <br />® Mining(MN) <br />March 15, 2015 <br />December 31, 2015 <br />