Laserfiche WebLink
%tom R'VE® <br />MAR 2 3' 2015 <br />DIVISItiata <br />(,r jAATION, <br />12. Total acres in various sta es of reclamation, since ermitted miain <br />T ERALS <br />FEE <br />EF'OR M PI <br />Name: <br />Occidental Oil Shale, <br />Name: <br />Lo an Wash <br />ee Due: <br />$633.00 <br />Vie: 1 <br />108.55 <br />112 Annual Report <br />Permit Number. M- 1977-424 <br />_ <br />County: Garfield _ <br />Annivers Date: March 28, 2015 <br />Current Bond Amt: 5570.42R_ilO <br />Page 2 of <br />According to C.R.S. 34- 32.5 -116 or 34-32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcomin <br />dates for the beginning of active operations, and the date active operations ceased for the year. i; year, the <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />_ NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). (ES NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? / > _ <br />� I •_ 1 f �� in r 11.1,2 r� "i,� � n <br />J II JAN l <br />5. Does the mine operate more than 180 days per year 14 <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. YESO. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining - incomplete and or unreleased reclamation) <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various sta es of reclamation, since ermitted miain <br />Total acres <br />Total acres <br />Total acres <br />backfitled: <br />, , <br />seeded w/� <br />, �I <br />w /topsoil <br />approved mix: <br />re laced: <br />Total acres <br />Total acres <br />Topsoil <br />graded: <br />g <br />r' y, -4 <br />fertilized w/ <br />.y tu.f�v <br />replacement <br />a vd fertilizer: depth in.): <br />Seed 13,zc sr- Fertilizer <br />application LiZr•a <. t s <br />1 application <br />method: method- <br />activities <br />(Y—U' NO <br />YES <br />v yy.c 3 <br />c, <br />Total acres <br />I y, -73 mulched w/ IIL <br />approved mulch: <br />Mulch application <br />L, rate (tons): 1-2- <br />Mulch ,rYJ;2L <br />application <br />method: 3,kc,i A,- ,+ s <br />