My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-24_REVISION - M2008080 (15)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008080
>
2015-03-24_REVISION - M2008080 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:54 PM
Creation date
3/25/2015 3:06:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008080
IBM Index Class Name
Revision
Doc Date
3/24/2015
Doc Name
Exhibit F Reclamation Plan TR01
From
J&T Consulting, Inc.
To
DRMS
Type & Sequence
TR1
Email Name
PSH
TAK
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEGEND: <br /> /'"/ r UTILITY POLE ® Q N oAr <br /> - rNY \ ! ` / / / / > GUY WIRE > Nrn <br /> 9 GAS LINE MARKER LJJ r-' z¢ �y °a o $ <br /> /X / PERMIT " o Z O Cl) <br /> —4597' 5� // // � / I BOUNDARY * OVERBURDEN AND TOPSOIL ® GAS VALVE o z V� a O LL 3 <br /> / / / DISTANCE VARIES 12.5 U) — <br /> \ EXISTING BACKFILL ALL DISTURBED AREAS 5 Q c <br /> / DOWN TO WATER SURFACE y M ° <br /> / \ SOUTH BRANCH" / / GROUND WELL <br /> OF PLUMB DITCH VARIES V c c <br /> \ / j// / TV \ ® WATER METER v <br /> '17 / `/ �1 // / �r !j 1 / 06 <br /> /y ... ... = 4591 WATER FAUCET 0� o S� m <br /> WALL WATER LINE MARKER a <br /> SLURRY <br /> A ELECTRIC TRANSFORMER <br /> SAND AND GRAVEL: ��Y\�\� <br /> t + \ <br /> y <br /> %�,�; ' � .. � �•, M r ;� � ,-. 3.•� TREE <br /> 1-59 <br /> [,': S� � TELEPHONE PEDESTAL <br /> li s \ / \ / <br /> Xfl ttt \ , \ �`//ff Opf 9 TELEPHONE LINE MARKER <br /> IT <br /> I v \, 6 \ <br /> PROPERTY LINE <br /> / <br /> f / f <br /> // / f� BEDROCK'/ ,/f "• //f ---x x --- _. FENCE LINE <br /> o r <br /> of of OVERHEAD ELECTRIC LINE r•• � <br /> 1 :• / / , , <br /> 111 EXISTING DUKE GAS <br /> TYPICAL BACKFILL SECTION G G p <br /> (� N.T.S. <br /> I- co <br /> 1 + ,,�• , � �-., ,� �I M' N'— UNDERGROUND WATER LINE � O <br /> ;Q O <br /> EXISTING CONTOURS (2' INTERVALS) O <br /> co <br /> GRAVEL ROAD p <br /> IMF-TER DRAIN I _ W CV a3 <br /> LOCATION PROPOSED PERMIT BOUNDARY U <br /> REQUIRED) BACKFILL EXISTING <br /> - I TRENCH WITH NATIVE -- PROPOSED SLURRY WALL CC <br /> MATERIALS <br /> `if' 11 s .l I _ <br /> PROPOSED CONTOURS <br /> r 4640 <br /> 't• �I . . . PERIMETER DRAIN <br /> 1 In ��\ li �' �,'. <br /> 1.5' TYP. SANDY CLAY <br /> —� OVERBURDEN <br /> VARIES . ASTM C33-7 <br /> ONC <br /> 1�����1��' \� „ . '• ti . , - A _ � ,,: 4 , 5 AGGREGATE ' <br /> V ' <br /> .' t\\\"I",\\\ \\\ 1 5 o I a e e (MIN) J <br /> vyz \\`\\ �®\\\\ ` \\} \ rA <br /> ASTM C33 <br /> CONCRETE SAND e. a 25' DITCHco <br /> (IF REQUIRED). VARIES .. a OFFSET �I = O <br /> 4.0' S`OpE ■ <br /> J. <br /> a e a SAND AND GRAVEL pC�ON Lam. <br /> \ F '{ ALLUVIUM 3:1 RAC BOTTOM OF DITCH 0 � O <br /> as 05' BANK SLOPE ` <br /> a.og g4 . (TYP.) C SOUTH BRANCH PLUMB DITCH <br /> TYP. (TYP.) V <br /> C'L OFFSET DETAIL C <br /> C <br /> N.T.S. iw <br /> 16 <br /> 1 tiv v o s� INLET/OUTLET 4 <br /> �� ( ✓ 4 y s i "Nkr <br /> \�\\ 1 FACILITY PERIMETER DRAIN DETAIL (TYPICAL SECTION IF REQUIRED) <br /> N.T.S. <br /> SLURRY WALL NOTES: <br /> 1\ 1. Bentonite Specifications 6. Soil—oil Backfill Specifications <br /> YP/PV ratio API Std. 13A less than 3 S—B backfill slump ASTM C 143 1 set per 100 cu. yds. <br /> Viscometer greater than 30 <br /> v <br /> Filtrate Loss lss than 15 cm3 Slump 2-6 inches g <br /> ' '' Moisture Content ASTM D 2216 less than 10 percent ° <br /> S—B backfilf gradation 1 set per 300 cu. yds. y <br /> d <br /> Test results for each lot of bentonite must be provided. o <br /> a I Screen (US Standard) Percent by Dry Weight <br /> 3 inch 2. Water Soecifications 100 Z <br /> PH 6-8 # 4 40-80 0 <br /> CR I Hardness less than 200 ppm #40 25-60 <br /> 58' Total Dissolved Solids <br /> ' less than 500ppm #200 20-40 W <br /> Oil, organics, acids, alkali less than 50 ppm each <br /> PERMIT Chloride report Minimum Plasticity Index of 10 H <br /> t } <br /> BOUNDARY 3. Bentonite Slurry General Specifications 7. ltev Trench and Slurry Wall Cap Specifications v <br /> The initial bentonite slurry must be tested prior to placement in During excavation, soundings should be obtained to determine the <br /> the trench. The slurry may be mixed in high shear mixers or elevations of the top of the key layer, the bottom of the CO a- <br /> EXISTING 25' mixed and hydrated in slur hydration GROUND Y slurry Y ponds. In general, a excavation, and the bottom of the trench prior to backfilling. If <br /> OVERBURDEN AND TOPSOIL minimum hydration time of 8 hours will allow the bentonite slurry sediments in excess of 2 inches have accumulated it is necessary f'3•� 33' BACKFILL ALL DISTURBED AREAS to meet all criteria. A minimum bentonite content of 6 percent in to clean the trench bottom by airlift pumps or excavation m of <br /> StopF DOWN TO WATER SURFACE 3' the slurry by weight is required. equipment to remove the sand and sediment that has settled. The <br /> 4 shift. Soundings should um, at the beginning <br /> _. s i o un i g sou be obtained approximately every <br /> Viscosity Marsh Funnel (API RP 13B— ) less 20 feet. PP Y rY <br /> 4594' bottom sou e cleaned, as a minim <br /> entonite Slurry Testing Specifications before Placement of each 'n s a r el a z° <br /> SLURRY WALL rat Loss than of the II will b layer <br /> e L <br /> an 40 sec <br /> Density less than 64 pcf Adequate keying in the S B backfill to an impermeable at <br /> •. . 0 cm3 <br /> less the b <br /> p 6.5 to 10 <br /> s an base wall wi a required and specified in the final <br /> H design report for the slurry wall The design documents will include <br /> a description of the key in layer and describe how trench cuttings <br /> i\/ The tests listed above should be run 1 or 2 times or other observations will be used to assure that the slurry wall ^✓ <br /> per shift and SAND AND GRAVEL : ' Yiyc\\/\ at least once per batch of slurry. The slurry must be further will be adequately keyed. Temporary slurry wall protection will be ^ D� <br /> tested after placement in the trench. The tests conducted are for required in the form of a noncompacted soil cover placed withinG7 <br /> \ viscosity, density, sand content, and pH. Two sets of tests per one day over each backfilled 100 foot reach. The temporary cover <br /> shift at two locations in the trench (approximately 2 feet below is removed after settlement (approximate) 2 weeks and replaced <br /> with a compacted cted clay cover over the completed I II <br /> s u slurry wall. <br /> m a la <br /> the slurry surface and 2 feet above the bottom of the trench) r <br /> \ \ are required If the density of the slurry in the trench exceeds 85 Job# _ _ 07113 <br /> pcf the excess solids must be removed by desanding or the slurry 8. Post Construction Testing <br /> Zreplaced with fresh slurry. The slurry level must be maintained at Post construction testing will be conducted in accordance with the Date _ _9/-- <br /> 200 100 0 200 400 600 / �j — 4'/ ' �DROCKfj" • �j Xj/' feast 3 feet above the ground water elevation and no more than Colorado State Engineer's Office." Drawne� _ WSS <br /> 2 feet below the platform. <br /> p of <br /> the working <br /> Z/ / .' /X/' / ��/ " " / P Deal gned By— TPY <br /> �/ /f' 9. Above specifications (notes 1-8) are provided as a general Checked By JCY <br /> SCALE IN FEET 5, Bentonite Slurry Testing Specifications after Placement guideline for permitting purposes. Final specifications and design Fite JT-Reclamation <br /> /�� /� Unit Weight 1.03 to 1.40 gm/cm3 criteria will be developed during the final design of the slurry wall. scale 1"=200' <br /> Lo\ T�/!• PICAL BACKFILL. SECTION Sand Content ASTM D 4381-84(1993)e10 to 20 percent by Sheet: of: <br /> N.T.S. volume <br /> 1 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.