Laserfiche WebLink
Marcia Talvitie -2- March 19, 2015 <br />BRL - Attached is revised bond release Figure 1 <br />4. DRMS 03/16 (New): The Division has conducted a thorough review of the Reclamation Cost <br />Estimate (RCE) for the Bowie No. 1 Mine. A March 16, 2015 memo, prepared by Susan <br />Burgmaier of the Division, is attached for your review and comment. A full copy of the <br />updated Reclamation Cost Estimate is also provided. <br />BRL - The revised reclamation cost estimate and proposed bond release amount are <br />acceptable to BRL. <br />Sincerely, <br />J. E. SfOVt'r <br />J. E. Stover, P.E. <br />Consulting Engineer <br />Cc: Basil Bear <br />Coal Program Support Staff <br />