My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-18_REPORT - M1986033
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1986033
>
2015-03-18_REPORT - M1986033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:31 PM
Creation date
3/25/2015 8:48:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986033
IBM Index Class Name
REPORT
Doc Date
3/18/2015
Doc Name
Annual Report Fee Map
From
Sunnyside Gravel & Excavation
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECFIVED <br />MAR 1 8 701 <br />DIVISf_„ _.:, __ . _.... "ATION, <br />MI VN <br />8 , F <br />110c :annual Report <br />Pa( *e 2 of 3 <br />Permittee Name: <br />Sunnyside Gravel K <br />Excavation <br />Permit \umber: <br />\1 -1956 -033 <br />Operation Name: <br />Hess Pit <br />County: <br />La Plata <br />Annual Fee Due: ; <br />S323.00 <br />.Anniversary Date: <br />March 11. 2015 <br />Permit Acreage: <br />9.00 <br />Current Bond Amt: <br />534,641.06 <br />According to C.R.S. 34 -32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee. an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitorine information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report %vill be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while'completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1), <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? <br />If "YES," please note time limits related to completion of reclamation. Rule 3.1.3. <br />4. What was the date of last excavation. processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year? <br />If "NO ". please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />?. Number of acres currently affected (mining - incomplete and or unreleased reclamation). <br />Y E NO <br />NO <br />YES 'O <br />2 -26 -15 <br />YES NO <br />YES O <br />YES <br />9.5 <br />8. Number of acres that were newly affected during the current report year. 0 <br />9. Number of acres that were reclaimed during the current report year. <br />_ 0 <br />10. Estimated new acreage to be affected in the next report year. <br />0 <br />11. Estimated acres to be reclaimed in the next report year. <br />0 <br />12. Total acres in various stases of reclamation, since permitted mining activities <br />beEan: <br />Total acres I TyTotal acres I I Total acres <br />I I Total acres <br />backfilled: I seeded w' 1 1 w /'topsoil <br />I mulched xv <br />approved mix: I replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />j <br />graded: <br />1 fertilized w! <br />replacement <br />rate (tons'ac): <br />aped fertilizer: <br />depth (in.): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />application <br />application <br />method: <br />method: <br />I method: <br />
The URL can be used to link to this page
Your browser does not support the video tag.