My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-23_PERMIT FILE - M2015008 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2015008
>
2015-03-23_PERMIT FILE - M2015008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:37 PM
Creation date
3/24/2015 12:20:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015008
IBM Index Class Name
PERMIT FILE
Doc Date
3/23/2015
Doc Name
Revisions Application
From
Kirkland Construction
To
DRMS
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan (SWPPP) <br />Blue Valley Ranch Site at 3375 Colorado State Highway 9 <br />Inspection Schedule <br />Specific Inspection Frequency <br />Overview of Inspection Requirements <br />Inspection Frequency: <br />• Once every 14 calendar days and within 24 hours of a storm event of 0.25 inches or greater. <br />Increased if the site discharges to a sensitive water. Inspection frequency may be decreased <br />to account for stabilized areas, or for arid, semi -arid, or drought- stricken conditions, or for <br />frozen conditions. <br />Areas That Need to Be Inspected <br />During each inspection, the following areas of the site will be inspected: <br />• Cleared, graded, or excavated areas of the site; . <br />• Stormwater controls (e.g., perimeter controls, sediment basins, inlets, exit points etc.) and <br />pollution prevention practices (e.g., pollution prevention practices for vehicle <br />fueling /maintenance and washing, construction product storage, handling, and disposal, <br />etc.) at the site; <br />• Material, waste, or borrow areas covered by the permit, and equipment storage and <br />maintenance areas; <br />• Areas where stormwater flows within the site; <br />• Stormwater discharge points; and <br />• Areas where stabilization has been implemented. <br />Rain Gauge Location: Will be located at staging area <br />Reductions in Inspection Frequency: <br />• For the reduction in inspections resulting from stabilization: <br />• For the reduction in inspections in arid, semi -arid, or drought- stricken areas: <br />• For reduction in inspections due to frozen conditions <br />Inspection Report Forms <br />See attached forms <br />6.2 Corrective Action <br />Personnel Responsible for Corrective Actions <br />Oversee development of SWPPP, in field modifications to SWPPP, taking corrective <br />actions, conducting site inspections <br />Field Supervisor <br />Joe Provost <br />719 - 251 -6916 <br />SWPPP Preparation Date 02 -12 -2015 Prepared by 16 <br />Iffiamman <br />Mm <br />L <br />
The URL can be used to link to this page
Your browser does not support the video tag.