My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-23_PERMIT FILE - M2015008 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2015008
>
2015-03-23_PERMIT FILE - M2015008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:37 PM
Creation date
3/24/2015 12:20:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015008
IBM Index Class Name
PERMIT FILE
Doc Date
3/23/2015
Doc Name
Revisions Application
From
Kirkland Construction
To
DRMS
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan ( SWPPP) <br />Blue Valley Ranch Site at 3375 Colorado State Highway 9 <br />4.12 Chemical Treatment <br />N/A <br />4.13 Dewatering Practices <br />N/A <br />4.14 Other Stormwater Controls <br />N/A <br />4.15 Site Stabilization <br />Permanent seeding for all disturbed areas. <br />Site Stabilization Practice (only use this if uncontrollable circumstances have delayed the initiation or <br />completion of stabilization) <br />Vegetative Non - Vegetative <br />Temporary Permanent <br />SECTION 5: POLLUTION PREVENTION STANDARDS <br />5.1 Potential Sources of Pollution <br />See Attached Pollutant Matirx and Spill Prevention Plan <br />5.2 Spill Prevention and Response <br />See Attached Pollutant Matirx and Spill Prevention Plan <br />5.3 Fueling and Maintenance of Equipment or Vehicles <br />See Attached Pollutant Matirx and Spill Prevention Plan - 150 % of spill containment capacity <br />requirement by means of earthen compacted berm as secondary containment measure. <br />5.4 Washing of Equipment and Vehicles <br />All equipment will be washed prior to entering the site. All contractors will be aware of this requirement <br />and will have signed attached certification of clean equipment form. <br />All equipment needing to be washed, due to equipment failure or leaking will be removed to a <br />contained staging area or offsite and cleaned. If cleaned at staging area. Plastic sheeting or absorbent <br />materials will be used and properly disposed of, according the spill prevention plan. <br />SWPPP Preparation Date 02 -12 -2015 Prepared by 13 <br />dhnmmfm <br />IMUA 16111.1 <br />L <br />
The URL can be used to link to this page
Your browser does not support the video tag.