My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-23_PERMIT FILE - M2015010 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2015010
>
2015-03-23_PERMIT FILE - M2015010 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:37 PM
Creation date
3/23/2015 3:17:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015010
IBM Index Class Name
PERMIT FILE
Doc Date
3/23/2015
Doc Name
Preliminary Adequacy Response
From
Castle Rock Construction Company
To
DRMS
Email Name
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br />RECLAMATION PLAN <br />COUNTY: Kit Carson <br />OPERATOR: Castle Rock Construction Co. of Colorado, LLC <br />1. 4 - 6" of topsoil is currently present on the site and will be stripped and <br />stockpiled. <br />2. The final slopes will be a maximum of 4:1 or flatter. Final slopes, both new and <br />existing that are disturbed, will be reclaimed, seeded and mulched utilizing the <br />attached seed and mulch plan that is specified on the highway project six miles <br />from the pit. No blanket or mulch tackifier is anticipated to be necessary. <br />3. The final use of the pit is rangeland. <br />4. No trees or shrubs will be removed from the rangeland. <br />5. No streams, roads or building will remain after reclamation. <br />6. The haul road will be returned to existing contours and to the use of rangeland. <br />7. It may become necessary to minimize stormwater surface flows across the pit <br />reclaimed slopes or to 'prevent flows from Spring Creek form entering into <br />the pit area after the mining operations are complete. A berm will be <br />constructed utilizing overburden and topped with topsoil along the northerly <br />edge of the existing drainage on the northern side of the mining area to solve <br />these potential issues. The size, shape and location of this berm will as shown <br />on the Reclamation Plan Map. <br />8. By salvaging and placing all existing topsoil as described above, the new <br />vegetation on the slopes will be greater than the extent of cover of the existing <br />vegetation on the surrounding areas. <br />9. The seeding will be done by the fall of 2015, probably at the same time as the <br />roadway project. A preparation and seeding list are attached in this Exhibit. The <br />site will be chiseled and disced after topsoiling and prior to seeding. <br />10. Prior to the seeding and mulching process, the reclaimed soil will be tested to <br />determine the need for fertilizer. These results will be supplied to the Division <br />prior to actual application for approval <br />
The URL can be used to link to this page
Your browser does not support the video tag.