EXHIBIT C <br />MINING PLAN <br />COUNTY: Kit Carson <br />OPERATOR: Castle Rock Construction Company of Colorado, LLC <br />1. Mining will commence in mid April 2015 or as soon thereafter as this permit is <br />approved and will continue until the completion of a Highway I70 re- construction <br />project from Vona to Stratton. The completion of this project will be in the fall of <br />2015. Reclamation will be complete by the time the project is finished. <br />2. All of the topsoil along with the grass root zone on the existing rangeland will be <br />salvaged for use in the reclamation process. Topsoil on the disturbed portions of <br />the pit, access road and overburden stockpile area will be striped to a depth of <br />4 -6 inches and stockpiled as shown on Exhibit E - Mining Plan Map, south of the <br />affected area. The topsoil will be placed back on the reclaimed area to the same 4- <br />6 inches, when possible, during excavation as the remaining aggregate is <br />excavated, thereby minimizing the size of the topsoil stockpile. <br />3. Any overburden that is required to be removed prior to excavating the aggregate <br />material will be placed in a stockpile as shown on Exhibit E — Mining Plan Map. <br />2 -3' of this material is anticipated. Overburden will be placed back on the <br />previously mined areas and graded to the elevation shown on the plan as mining <br />proceeds prior to reclamation. <br />4. If stock piles are left for extended time over 180 days they will be temporarily <br />seeded. Temporary seeding will utilize the seed mix stated in the reclamation <br />plan. Any runoff from the stockpile will be channeled toward the excavation <br />area. No drainage ways will be blocked by or contact the stockpile of topsoil. <br />Topsoil placement will be complete by the fall of 2015. <br />5. Thickness of aggregate material to be mined is 10 to 15 feet. <br />6. Aggregate will be excavated within the pit limits and hauled directly to the project <br />batch plant site on the Clapper property approximately 2000' east of the pit <br />limits for processing outside of the pit limits. No processing of the material will <br />occur on the site. <br />7. A temporary 2,500' by 30' access to County Road U will be built by CRCC and is <br />included in the pit limits and acreage totaling 28.0 acres that is being requested in <br />the permit. This temporary entry enters directly onto existing CRU. The access <br />road will be returned to existing contours when mining is completed and returned <br />to its current use as rangeland <br />8. The pit is existing side hills in rangeland which will be mined by beginning at the <br />western edge of the pit limits and excavating easterly. The pit floor will be graded <br />