Laserfiche WebLink
Colowyo Coal Company <br />2014 Annual Reclamation and Hydrology Report <br />Figure 7 -4 - South Taylor Fill (West Taylor) Quarterly Inspection Report <br />INSPECTION REPORT - SOUTH TAYLOR FILL <br />(Including Both the East Taylor and West Taylor Fill Segments) <br />INDICATE QUARTER —> 1ST ® 2ND O 3RD El 4T" D 2014 <br />YEAR <br />*ALL QUARTERS NEED TO BE CERTIFIED* <br />THE FOLLOWING ITEMS ARE TO BE INSPECTED AND REPORTED AS NOTED: <br />1) Has any significant change been noted in the survey monuments on the fill? <br />No NA Yes <br />If yes, explain: <br />Date of Survey: <br />Reviewed By: Lee Sampson, Kurt Blunt <br />2) Has any significant change been noted in the water level found in the fill monitoring <br />well? <br />No X Yes Measured Level 224.8 feet If yes, explain: <br />Date of Measurement: 3/19/2014 <br />Measured By: Lee Sampson, Kurt Blunt <br />3) Has there been any evidence of surficial slope failure on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of P.E. Inspection: 3/19/2014 <br />Inspected By: Lee Sampson, Kurt Blunt <br />4) Has there been any formation of springs or seeps on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of Inspection: 3/19/2014 <br />Inspected By: Lee Sampson. Kurt Blunt <br />Signed: -- -�- <br />Date: 3 19 -1 y <br />Reference Permit - Volume 13, Exhibit 21, Item 1, Introductory Pages <br />CF: HSEQ 24.20.04 <br />Page 7 -18 <br />47031 = <br />3 <br />IIIIIII1100% <br />Revised Feb. 7, 2008 <br />