Laserfiche WebLink
FREEPBRYMMORAN <br />COPPER & COLD ORDER 400001232414 <br />Sort Field: 111501DA03 quipment: 100000008159 escri tion: <br />unctional Location <br />oat Center: 2402001111 unctional Location: HE- 2- MI -C8 -TC -1866 escription: <br />4lain Work Center.. 4600P Serial No.: M Activity Type: PCM <br />Start Date: 06/02/2014 nd Date: 06/04/2014 riority: 3 <br />Description: PM - LEAK DOWN TEST ON #3 DAM SEEP WATE <br />Person Responsible: erson Responsible Description: <br />Failure Information Check Comments <br />or <br />M M M4z <br />Henderson <br />TAILINGS DAM #3 <br />TAILINGS DAMS <br />rder Type: MN03 <br />rioinAtnr: 065290 <br />erational Practice <br />Wear and tear <br />FOLLOW ALL SAFETY INSTRUCTIONS RELATED TO EACH OPERATION <br />peration <br />People <br />10 4600P LEAK DOWN TEST OF SEEP WATER LINE <br />LEAK DOWN TEST OF SEEP WATER LINE <br />REV. DATE:02/01 110 SUPERSEDES:07 /03 /07 <br />STD. JOB # 698 SUPRVSR. APPROVAL: Lenny Owens <br />RECENT CHANGES TO THIS DOCUMENT ARE SURROUNDED BY ASTERISKS. <br />LAST REVIEW DATE 03/28/11 <br />PROVIDE COPIES TO TIM HAYNES AND CURTIS BROWN UPON <br />COMPLETEION. <br />1. Shut the Intake Valves and make sure that they do <br />no 7rQ - checking discharge valves for water <br />flow. <br />2. se discharge valves for drain line and overflow <br />line. <br />3. Fill drain line and overflow line and check discharge <br />va esdr leaks. <br />4. Lo all valves and read pressure gauge at the <br />dischar valves. <br />5. Lock all valves and read pressure gauges at the <br />discharge valves: -� <br />Drain Line Pressure <br />5 Dateffime <br />i i 4 <br />HM ®62015 <br />rl}Sizfr�t4�m ei1TEr''�Clarii�af;`rgihP <br />ffflWn'g &safety <br />