Laserfiche WebLink
Table D -1 - Mining Timetable <br />Description <br />Years of <br />Mining <br />Build topsoil berm and overburden stockpile. Revegtate berm and pile <br />immediately upon completion. Mine out Phase 1 A and 1 B. <br />1.7 <br />Mine out Phase 1C phase after backfilling Phase IA. Topsoil and <br />revegetate Phase IA. <br />3.4 <br />Reclaim most of Phase 1B and some of Phase 1C while mining Phase <br />2. <br />5.9 <br />Reclaim Phase 2 while mining Phase 3. <br />4.7 <br />Reclaim Phase 3 while mining Phase 4. End of mining. <br />2.2 <br />17.9 <br />Cerise Mine March 2015 D -4 <br />Table D -2 — Mining Phases and Disturbance <br />Active <br />Area of Phase <br />Disturbance <br />See Man <br />Mining Area <br />acres <br />Area (acres) <br />Phase IA <br />5.0 <br />End of mining in Phase 1 <br />22.2 <br />Mining <br />Map 1 <br />Phase 1B <br />3.8 <br />End of mining in Phase 1B <br />22.2 <br />Mining <br />Map 2 <br />Phase 1 C <br />9.5 <br />End of mining in Phase 1 C <br />19.9 <br />Mining <br />Map 3 <br />Phase 2 <br />14.0 <br />End of mining in Phase 2 <br />29.7 <br />Mining <br />Map 4 <br />Phase 3 <br />14.6 <br />End of mining in Phase 3 <br />31.4 <br />Mining <br />Map 5 <br />Phase 4 <br />6.4 <br />End of mining in Phase 4 <br />28.2 <br />Mining <br />Map 6 <br />Cerise Mine March 2015 D -4 <br />