Laserfiche WebLink
Table L -1— Reclamation Cost Estimate <br />Activity Description <br />Time <br />Months <br />Quantity <br />Unit Cost $ <br />Cost $ <br />Backfill and grade Phase I <br />1 <br />236,192 CY <br />$ 1.50 <br />$354,288 <br />Backfill and grade Phase 1B <br />1 <br />138,904 CY <br />$ 1.50 <br />$208,356 <br />Remove scale and office trailer <br />0.1 <br />1 <br />$ 1,000.00 <br />$ 1,000.00 <br />Topsoil all disturbed areas to be <br />reve etated. <br />0.5 <br />29,525 CY <br />$ 1.50 <br />$44,288 <br />Broadcast seed all to soiled areas <br />0.5 <br />23.4 acres <br />$ 650.00 <br />$15,210 <br />Mulch all seeded areas <br />0.5 <br />23.4 acres <br />$ 500.00 <br />$11,700 <br />Totals <br />2.5 <br />$634,842 <br />DRMS Costs 28% x direct costs <br />$177,756 <br />Total Bond Amount <br />$812,597 <br />Cerise Mine March 2015 L -2 <br />