Laserfiche WebLink
operations except emergency maintenance to ensure the integrity of operating equipment will <br />take place on Sunday. <br />6. Garfield County Impacts <br />The Garfield County land use permit has been approved by the Garfield County Board of County <br />Commissioners. This permit addresses the impacts the operation will have on the local citizenry. <br />7. Importing of Material <br />The pit may accept concrete and/or asphalt materials that have been removed from existing sites <br />in order that they can be recycled through the plants on site. Fill material may also be accepted <br />into the mine site. Fill material will be spread out on the mined out pit floor and will be blended <br />into the final landscape. Some material may also be re -sold as construction material. None of <br />this material can be accepted by the Operator without certification by the deliverer that it is inert <br />and safe. <br />Cerise Mine March 2015 D -7 <br />