Laserfiche WebLink
March 12, 2015 C- 1981 - 018 /Deserado Mine ZTT <br />Vent Shafts and Nitrogen Injection Pads. Each pad was in compliance and no erosion was observed. <br />Pond DP -1. <br />Nitrogen plant. <br />Rock check below rock dust tank pad. Last Chance Pond. <br />PROCESSING WASTE /COAL MINE WASTE PILES — Rule 4.10 and 4.11 <br />Drainage Control; Surface Stabilization; Placement: <br />Refuse has been stored on top of Refuse Pile RP -2/3/4 for the winter months. Once weather and temperature <br />allows, the refuse will be spread and compacted. Both Refuse Piles RP -2/3/4 and RP -5A are stable with no signs <br />of sloughing or slumping. The piles have been graded to allow surface runoff to be dircted to perimeter ditches <br />which then report to one of the three associated sediment ponds. No issues were observed with the refuse piles. <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 4 of 7 <br />