Laserfiche WebLink
BULLDOZER RIPPING WORK <br />Task description: Rip 10 acres and rip the road <br />Site: Kagan & Son South Pit Permit Action: CNO1 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 3/17/2015 County: Custer <br />User: TOD <br />Seismic: <br />Area: <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8U <br />Ripper Attachment: 3 -Shank Ripper <br />Cost Breakdown: <br />Permit/Job #: M1994114 <br />Abbreviation: None <br />Filename: M114 -002 <br />Horsepower: 310 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />BCY or CCY <br />Hours <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$69.05 <br />NA <br />Operating Cost/Hour: <br />$108.22 <br />100 <br />Ripper Operating Cost/Hour: <br />$7.46 <br />100 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total Unit Cost/Hour: <br />$222.73 <br />Total Fleet Cost/Hour: <br />$222.73 <br />MATERIAL QUANTITIES <br />Selected estimating method: Area <br />Alternate Methods: <br />NA Bank Volume: <br />NA <br />BCY NA <br />10.00 acres Rip Depth (ft): 2.00 <br />Volume: 32,267 <br />Source of estimated quantity: <br />DRMS estimate and CNO1 Exhibit E <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />2.56 <br />mph <br />Average Ripping Width: <br />7.08 <br />degrees <br />Average Ripping Length: <br />660.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.830 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.830 <br />Acres/hr <br />Site Altitude: <br />8,300 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: 0.69 <br />Acres /hr <br />Adjusted Hourly Fleet Production: 0.69 <br />Acres /hr <br />JOB TIME AND COST <br />Fleet size: I Grader(s) <br />Total job time: <br />14.51 <br />Unit cost: $323.118 Per acre <br />Total job cost: <br />$3,231 <br />BCY or CCY <br />Hours <br />CIRCES Cost Estimating Software <br />