Laserfiche WebLink
Projected Subsidence Monitoring — 2014 <br />No subsidence monitoring will be performed in 2014. <br />Through technical revision number 45, the DRMS approved a reduction in subsidence <br />monitoring. The wide spaced subsidence monuments, Sites 6, 14, 15, 16, DH 55, DH <br />65, DH 66, DH 68, 81, 82, 83, 95 and 99 will not be surveyed during 2015. <br />Though technical revision number 57, the DRMS approved the cessation of subsidence <br />monitoring of the seven (7) Pitkin Mesa Pipeline monitoring locations. These <br />monitoring stations (PL -01 through PL -07) will not be surveyed during 2015. <br />K <br />