Laserfiche WebLink
Reveg Worksheet Cont'd Task # 003 Page 2 of 2 <br />Total Seed Application Cost /Acre 1 $261.28 <br />MULCHING and MISCELLANEOUS <br />Materials <br />Description <br />Units / <br />Acre <br />Unit <br />Cost / Unit <br />Cost /Acre <br />Straw, delivered {MEANS 3125 14.16 1200} <br />2.00 <br />TON <br />$265.00 <br />$530.00 <br />Total Mulch Materials Cost /Acre <br />Totals Nursery Stock Cost / Acre <br />$0.00 <br />$530.00 <br />Annliention <br />Description <br />Cost /Acre <br />Crimping, with tractor (DMG survey data} <br />$65.89 <br />Power mulcher (MEANS 32 91 13.16 0250) <br />$86.68 <br />Weedspray, truck, non - aquatic area, nox. [DMG] <br />$61.49 <br />Total Mulch Application Cost /Acre <br />$214.06 <br />NURSERY STOCK PLANTING <br />Common Name <br />No / <br />Acre <br />Type and Size <br />Planting <br />Cost <br />Fertilizer <br />Pellet Cost <br />Cost /Acre <br />Totals Nursery Stock Cost / Acre <br />$0.00 <br />JOB TIME AND COST <br />No. of Acres: <br />Estimated Failure Rate: <br />*Selected Replanting Work Items: <br />Initial Job Cost: <br />Reseeding Job Cost: <br />Total Job Cost: <br />Job Hours: <br />$4,445.32 <br />$1,111.33 <br />$5,557 <br />10.00 <br />3.33 Cost /Acre: $1,334.93 <br />25% Cost /Acre *: $1,334.93 <br />FERTILIZING,TILLING, SEEDING, <br />MULCHING <br />CIRCES Cost Estimating Software <br />