Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 002 Page 1 of 2 <br />Task description: <br />Site: Stones Ranch Grav Pt <br />BULLDOZER WORK <br />3 inches of Growth Medium over 3.33 Ac <br />Permit Action: TR -02 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: <br />Date: 3/16/2015 County: <br />User: TC1 <br />Colorado <br />Teller <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D8T - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Permit/Job #: M1991080 <br />Abbreviation: None <br />Filename: M080 -002 <br />Total unit Cost/Hour: $208.90 <br />Total Fleet Cost/Hour: $208.90 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,343 <br />Swell factor: 1.000 <br />Loose volume: 1,343 LCY <br />Source of estimated volume: 3 inches from orig application over 3.33 acres <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />250 feet <br />377.8 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />Weight description: <br />-20% <br />8,500 feet <br />0 lbs/LCY <br />Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$62.67 <br />AVG. <br />NA <br />Operating Cost/Hour: <br />$108.22 <br />(CAT HB <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />(SLOT) <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />AVG. <br />NA <br />Total unit Cost/Hour: $208.90 <br />Total Fleet Cost/Hour: $208.90 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,343 <br />Swell factor: 1.000 <br />Loose volume: 1,343 LCY <br />Source of estimated volume: 3 inches from orig application over 3.33 acres <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />250 feet <br />377.8 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />Weight description: <br />-20% <br />8,500 feet <br />0 lbs/LCY <br />Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />AVG. <br />Material consistency: <br />0.900 <br />(CAT HB <br />Dozing method: <br />1.200 <br />(SLOT) <br />Visibility: <br />1.000 <br />AVG. <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />