My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-16_REVISION - M1991080
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1991080
>
2015-03-16_REVISION - M1991080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:07 PM
Creation date
3/18/2015 10:19:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991080
IBM Index Class Name
REVISION
Doc Date
3/16/2015
Doc Name
Preliminary Adequacy Review TR02
From
DRMS
To
Cathleen Van Egmond, Russ Van Egmond
Type & Sequence
TR2
Email Name
TC1
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task # 001 Pagel of 2 <br />BULLDOZER WORK <br />Task description: Cut Pit walls to a 5H: IV Slope <br />Site: Stones Ranch Grav Pt Permit Action: TR -02 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: <br />Date: 3/16/2015 County: <br />User: TC 1 <br />Colorado <br />Teller <br />Agency or organization name: DRMS <br />Permit/Job #: M1991080 <br />Abbreviation: None <br />Filename: M080 -001 <br />HOURLY EQUIPMENT COST <br />(AVG. <br />0.900 <br />Basic Machine: Cat D8T - 8SU <br />1.200 <br />SLOT <br />Horsepower: 310 <br />AVG.) <br />0.830 <br />Blade Type: Semi - Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$62.67 <br />NA <br />Operating Cost/Hour: <br />$108.22 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $208.90 <br />Total Fleet Cost/Hour: $208.90 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,378 <br />Swell factor: 1.165 <br />Loose volume: 1,605 LCY <br />Source of estimated volume: SO -01 estimate divided by 3 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />250 feet <br />377.8 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />-20% <br />8,500 feet <br />900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />0.750 <br />(AVG. <br />0.900 <br />CAT HB ) <br />1.200 <br />SLOT <br />1.000 <br />AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />
The URL can be used to link to this page
Your browser does not support the video tag.