My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-16_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2015-03-16_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:26 PM
Creation date
3/18/2015 8:05:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
3/16/2015
Doc Name
Reclamation Cost Estimate
From
Susan Burgmaier
To
Marcia Talvitie
Type & Sequence
SL5
Email Name
SLB
MLT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 1 Mine (C1981038)Surety Release No. 5 (SL-5)Page 5of 128 <br />Dozing method:1.000(GEN.) <br />Visibility:1.000(AVG.) <br />Job efficiency:0.830(1 SHIFT/DAY) <br />Spoil pile:0.800(FND-RF) <br />Push gradient:0.786(CAT HB) <br />Altitude:1.000(CAT HB) <br />Material Weight:0.793(CAT HB) <br />Blade type:1.000(PAT) <br />Net correction:0.2794 <br />Adjusted unit production:138.95 LCY/hr <br />555.8 <br />Adjusted fleet production:LCY/hr <br />JOB TIME AND COST <br />Fleet size:4 Dozer(s) <br />Unit cost:$2.629/LCY <br />5.92 <br />Total job time:Hours <br />Total job cost:$8,648 <br />
The URL can be used to link to this page
Your browser does not support the video tag.