Laserfiche WebLink
Bowie No. 1 Mine (C1981038)Surety Release No. 5 (SL-5)Page 5of 128 <br />Dozing method:1.000(GEN.) <br />Visibility:1.000(AVG.) <br />Job efficiency:0.830(1 SHIFT/DAY) <br />Spoil pile:0.800(FND-RF) <br />Push gradient:0.786(CAT HB) <br />Altitude:1.000(CAT HB) <br />Material Weight:0.793(CAT HB) <br />Blade type:1.000(PAT) <br />Net correction:0.2794 <br />Adjusted unit production:138.95 LCY/hr <br />555.8 <br />Adjusted fleet production:LCY/hr <br />JOB TIME AND COST <br />Fleet size:4 Dozer(s) <br />Unit cost:$2.629/LCY <br />5.92 <br />Total job time:Hours <br />Total job cost:$8,648 <br />