My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-16_REVISION - P2014009
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2014009
>
2015-03-16_REVISION - P2014009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 12:19:14 PM
Creation date
3/17/2015 8:47:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2014009
IBM Index Class Name
REVISION
Doc Date
3/16/2015
Doc Name
Request SL01
From
New West Reclamation, LLC
To
DRMS
Type & Sequence
SL1
Email Name
DMC
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Facility Located at: CR 1c Leadville Lake County, C080461 <br />I Center Point Latitude 39.23339 Longitude - 106.23470 <br />All discharges must comply with the lawful requirements of federal agencies municipalities, counties, drainage districts and other <br />local agencies regarding any discharges to storm drain systems, conveyances, or other water courses under their jurisdiction. <br />Monitoring Requirements <br />1. Benchmark monitoring for Discharges from Waste Rock and Overburden Piles <br />Parameter <br />CERTIFICATION TO DISCHARGE UNDER CDPS GENERAL PERMIT COR040000 <br />pF'CO <br />STORMWATER ASSOCIATED WITH <br />Sample <br />Type <br />METAL MINING OPERATIONS AND MINE -WASTE REMEDIATION <br />mg/L <br />Certification Number: COR040282 <br />1876 " <br />This Certification to Discharge specifically authorizes: <br />Colorado Department <br />New West Reclamation LLC <br />of public Health <br />to discharge stormwater from the facility identified as <br />and Envimnmenr <br />Garibaldi Waste Dump <br />NTU <br />to:California Gulch - Arkansas River <br />Facility Located at: CR 1c Leadville Lake County, C080461 <br />I Center Point Latitude 39.23339 Longitude - 106.23470 <br />All discharges must comply with the lawful requirements of federal agencies municipalities, counties, drainage districts and other <br />local agencies regarding any discharges to storm drain systems, conveyances, or other water courses under their jurisdiction. <br />Monitoring Requirements <br />1. Benchmark monitoring for Discharges from Waste Rock and Overburden Piles <br />Parameter <br />Units <br />Benchmark Values Rationale <br />Monit °rang <br />Frequency <br />Sample <br />Type <br />Total Suspended Solids (TSS) <br />mg/L <br />100 EPA <br />Quarterly <br />Grab <br />Benchmarks <br />Turbidity <br />NTU <br />50 <br />Quarterly <br />Grab <br />Ben hmarks <br />pH <br />S.U. <br />EPA <br />6.0-9.0 <br />Benchmarks <br />Quarterly <br />Grab <br />Total Antimony <br />mg/L <br />0.64 EPA <br />Quarterly <br />Grab <br />Benchmarks <br />Total Arsenic <br />mg /L <br />0.15 <br />EPA <br />Benchmarks <br />Quarterly <br />Grab <br />Total Beryllium <br />mg/L <br />0.13 <br />EPA <br />Quarterly <br />Grab <br />Benchmarks <br />Total Cadmium <br />mg/L <br />0.0018 <br />EPA <br />Quarterly <br />Grab <br />Benchmarks <br />Total Copper <br />mg/L <br />0.0123 <br />Quarterly <br />Grab <br />Benchmarks <br />Total Iron <br />mg/L <br />1.0 <br />EPA <br />Quarterly <br />Grab <br />Benchmarks <br />Total Lead <br />mg /L <br />0.069 <br />EPA <br />Quarterly <br />Grab <br />Benchmarks <br />Total Mercury <br />mg/L <br />0.0014 <br />EPA <br />Benchmarks <br />Quarterly <br />Grab <br />Total Nickel <br />mg/L <br />0.42 <br />Quarterly <br />Grab <br />Ben hmarks <br />Total Selenium <br />mg /L <br />0.005 <br />Quarterly <br />Grab <br />Ben hmarks <br />Total Silver <br />mg/L <br />0.0030 I <br />EPA <br />Benchmarks <br />Quarterly <br />Grab <br />Total Zinc <br />mg/L <br />0.11 ! <br />Quarterly <br />Grab <br />Benchmarks <br />Additional Monitoring Requirements <br />On the effective date of this certification, the Garibaldi Waste Dump facility is subject to the monitoring requirements discussed <br />below at each discharge point of stormwater from the facility. <br />Monitoring frequency: The permittee must collect samples of stormwater discharge from the facility once per quarter unless <br />otherwise directed by the Division. <br />
The URL can be used to link to this page
Your browser does not support the video tag.