Laserfiche WebLink
s 74VED <br />P 10 2015 <br />ERALS <br />MAP 18W <br />112c Annual Report <br />Page 2 of 3 <br />Pe��mittee Name: <br />Grand County <br />Permit Number: <br />M- 1977 -256 <br />I Operation Name: <br />Benson Pit <br />County: <br />Grand <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />March 23, 2015 <br />Permit age: <br />104.28 <br />Current Bond Amt: <br />$0.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, <br />it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />Total acres <br />w /topsoil <br />re laced: <br />Total acres <br />mulched w/ <br />a roved mulch: <br />1. <br />Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />YES NO <br />2. <br />Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />YES NO <br />3. <br />Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />Seed <br />application <br />method: <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />Fertilizer <br />application <br />method: <br />4. <br />What was the date of last excavation, processing or hauling activity at the mine? <br />Iy <br />5. <br />Does the mine operate more than 180 days per year <br />YES G <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. <br />Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />OPERATION? <br />a V000 <br />b) approval for INTERMITTENT <br />16 <br />7. <br />Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />during <br />1 d C- C <br />8. <br />Number of acres that were newly affected the current report year. <br />70 <br />9. <br />Number of acres that were reclaimed during the current report year. <br />�c <br />/ <br />10. <br />Estimated new acreage to be affected in the next report year. <br />1 <br />(of I % <br />11. <br />Estimated acres to be reclaimed in the next report year. <br />•� 1 <br />12 Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres TM <br />backfilled: <br />es <br />/ <br />mix. <br />Total acres <br />w /topsoil <br />re laced: <br />Total acres <br />mulched w/ <br />a roved mulch: <br />Total acres <br />graded: <br />oaes <br />fertilized w/ <br />apvd fertilizer: <br />��� <br />I Topsoil <br />replacement <br />depth (in.): <br />�' <br />�� <br />Mulch application <br />rate (tons): <br />U14—, <br />Seed <br />application <br />method: <br />Fertilizer <br />application <br />method: <br />A�IA- <br />Mulch <br />application <br />method: <br />