Laserfiche WebLink
New Horizon Mine <br />Figure 1 - CDRMS Annual Reclamation Report Form <br />Annual Reclamation Report for the Year 2014 <br />New Horizon Mine C -81 -008 Western Fuels Colorado, LLC <br />Mine name permit # Perm ittee <br />Address: P.O. Box 628 / 27646 W. 5`h St Nucla, CO 81424 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon by the <br />Division. It should include text, discussion, and maps, at a minimum, in addition to any other reclamation monitoring <br />data as required by the approved permit. The location of the acreage reported under each land status category and <br />year of seeding (if applicable) should be clearly and accurately identified on a map included with the report. <br />Land Status Category <br />Last Years Cumulative <br />Total <br />This Calendar Year <br />Cumulative Total <br />Acres disturbed <br />728.25NH2 + 73.71 NH1 = <br />801.96 <br />0.0 NH2 + 0.0 NH1 = <br />801.96 <br />0.0 <br />Acres backfilled and graded <br />615.62 NH2 +73.71 NH1* = <br />0.0 NH2 + 0.0 NH1 = <br />671.23 <br />671.23 <br />0.0 <br />Acres topsoi led <br />473.58 NH2 + 73.71 NH1* = <br />98.8 NH2 + 0.0 NH1 = <br />646.09 <br />547.29 <br />98.8 <br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for each category <br />below. Do not include acres that have achieved final, Phase III release. <br />* *= include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 801.96 and the total number of acres: <br />Phase I released 364.74(NH2) +314.10(NH1)= 678.84 Phase II released 00.03(NH2) +283.45(NH1)= 583.48 <br />Phase III released 215.50 (NH1) <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed NA <br />6. For Government Performance and Results Act <br />Acreage in long -term mining or reclamation facilities 2 80.3 <br />Acreage in active mining areas 3 202.8 <br />'(exclude acres where Phase III release has been achieved) <br />Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste impoundments; head -of- hollow fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area <br />(garbage dumps and coal combustion by- products disposal areas). <br />2014 Annual Reclamation Report Page 11 <br />Last Years <br />This Calendar <br />Cumulative Total <br />10 years or <br />Greater than <br />Cumulative Total <br />year <br />less <br />10 years 1 <br />427.2 NH2+ <br />25.3 NH2 + 0.0 <br />176.48 (NH2) + <br />276.02 (NH2) <br />Acres seeded** <br />73.71* NH1 = <br />NH1= 25.3 <br />526.21 <br />0.0 (NH1) _ <br />+ 73.71(NH1 *) <br />500.91 <br />176.48 <br />= 349.73 <br />* *= include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 801.96 and the total number of acres: <br />Phase I released 364.74(NH2) +314.10(NH1)= 678.84 Phase II released 00.03(NH2) +283.45(NH1)= 583.48 <br />Phase III released 215.50 (NH1) <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed NA <br />6. For Government Performance and Results Act <br />Acreage in long -term mining or reclamation facilities 2 80.3 <br />Acreage in active mining areas 3 202.8 <br />'(exclude acres where Phase III release has been achieved) <br />Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste impoundments; head -of- hollow fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area <br />(garbage dumps and coal combustion by- products disposal areas). <br />2014 Annual Reclamation Report Page 11 <br />