My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-16_REPORT - C1981010
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981010
>
2015-03-16_REPORT - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 10:16:09 AM
Creation date
3/17/2015 7:56:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Report
Doc Date
3/16/2015
From
Trapper Mining Inc
To
DRMS
Annual Report Year
2014
Permit Index Doc Type
Hydrology Report
Email Name
TNL
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br />MAR 1 6 [015 <br />2014 Annual Hydrology Report for Trapper Mine _ __ -, RPrlamation, <br />Mmmg <br />& Safety <br />2.1 Climatological Data <br />The 2014 National Weather Service Cooperative monthly summaries and the historical precipitation <br />summary (1978 -2014) are included in Section 2.5. For the year of 2014 precipitation totaled 17.91 ", <br />providing 132 percent of the established historical pre- mining (44 -YR) annual precipitation mean and 108 <br />percent of the project -to -date annual precipitation mean (Figure 2 -1). The highest monthly precipitation <br />amount was recorded in August (3.95 ") with the second and third highest totals occurring in September <br />and May (2.04" and 2.02 ", respectively). <br />2.2 Pit Dewatering and Consumptive Water Use for 2014 <br />During 2014, Trapper dewatered approximately 31.16 acre -feet of water from four active pits and 99.15 <br />acre -feet of water from G -Pit dewatering wells. (Table 1 -1 of Section 2.5 sub - section 1.0 shows the <br />pumping volumes for each activity). The dewatering wells are expected to produce at approximately the <br />same rates for 2014. All pit water was routed into the NPDES drainage system with resulting discharges <br />monitored accordingly when pumped off site. The majority of pumped water was utilized on haulroads for <br />dust suppression. <br />Approximately 171.85 acre -feet of water was used for dust suppression on haul roads and topsoil <br />handling operations in 2014. This value declined this year compared to rising consumption during the <br />past few years. The majority of this water was utilized from A -Pit where water has been stored in the <br />inactive pit. Dust suppression water demands continue to be offset by the successful application of dust <br />suppression chemical treatments on haulroads. Haul routes were similar in 2014 to 2013 routes. Life -of- <br />mine Haulroad is still the primary route for coal delivery to the Craig Station. Continued activity in the <br />eastern portion of the mine accounts for the majority of dust suppression water usage. Reduction in <br />temporary haul routes through the slide, and an extremely wet August may account for the reduced water <br />usage after several years of increased consumption. Total water volume used by Trapper Mine in 2014 <br />was approximately 302 acre -feet, a slight increase over 2013 consumption at 245 acre feet. <br />2.3 Mining Advancement and Ash Disposal Sites <br />The 2014 Annual Reclamation maps (see Trapper's 2014 annual report), the Water -Level Elevation maps <br />2 -1, 2 -2 and 2 -3 (included in this report) , and permit Map M52 (see mine permit) depict the following <br />mining activities through year -end: <br />a) Project to date utility waste disposal sites. <br />b) Project to date pit advancement (toe of pit). <br />C) Project to date monitoring wells, and natural and spoil springs and seeps. In the 2014 report, all <br />applicable spring and seep sites within the permit area are depicted to provide location <br />information for future reference. <br />2.4 Monitoring Points <br />Refer to Map M52 in the mine permit for locations of all the operational hydrologic monitoring points. No <br />new ground water monitoring wells were installed during 2014. <br />
The URL can be used to link to this page
Your browser does not support the video tag.