Laserfiche WebLink
3/13/15 <br />RECEIVED <br />MAR 16 2015 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />Revised Report of 2014 112c <br />Annual Report <br />This report has been revised to fix an error in the acres affected. The <br />annual fee was paid when the original report was submitted in July <br />2014. <br />Thanks <br />Damian Flores <br />l <br />GCC Quarry Manager <br />40 <br />GCC Rio Grande Pueblo Plant <br />3372 Lime Road <br />Pueblo, CO 81004 <br />Phone. (719) 647 -6832 <br />Cell. (719) 214 -7999 <br />Fax. (719) 647 -6899 <br />Email dflores @gcc com <br />Building Together H'WW.9 <br />cc com <br />