Laserfiche WebLink
EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />PUEBLO WEST <br />Total one -way travel distance: <br />30.00 miles <br />Average Travel Speed: <br />45.00 mph <br />Total Non - Roadable Mob/Demob Cost * <br />`* <br />$6,970.45 <br />two round trips with haul rig: <br />NA <br />Total Roadable Mob/Demob Cost ** <br />$113.59 <br />* * one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.67 <br />0.67 <br />0.67 <br />0.67 <br />0.50 <br />NA <br />0.50 <br />NA <br />2.33 <br />1.33 <br />Total job time <br />4.67 Hours <br />Total job cost: $7,084 <br />CIRCES Cost Estimating Software <br />