My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-12_REVISION - C1981014 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2015-03-12_REVISION - C1981014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:15 PM
Creation date
3/13/2015 12:18:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
3/12/2015
Doc Name
Cost Estimate (RN6)
From
DRMS
To
Energy Fuels Coal, Inc.
Type & Sequence
RN6
Email Name
RDZ
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Backfdl and Regrade Pond 4 <br />Site: Southfield Mine Permit Action: RN6 Permit/Job #: C1981014 <br />PROJECT IDENTIFICATION <br />Task #: 035 <br />Date: 8/1/2014 <br />User: JHB <br />State <br />County <br />Colorado <br />Fremont <br />Agency or organization naive: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Abbreviation: None <br />Filename: C014 -035 <br />Total unit Cost/Hour: $271.17 <br />Total Fleet Cost/Hour: $271.17 <br />MATERIAL QUANTITIES <br />Initial Volume: 14,000 <br />Swell factor: 1.125 <br />Loose volume: 15,750 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourly <br />production: <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />125 feet <br />1,055.6 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />6,100 feet <br />2,650 lbs /LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$81.10 <br />NA <br />Operating Cost/Hour: <br />$143.16 <br />100 <br />Ripper op. Cost /Hour: <br />$8.91 <br />100 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $271.17 <br />Total Fleet Cost/Hour: $271.17 <br />MATERIAL QUANTITIES <br />Initial Volume: 14,000 <br />Swell factor: 1.125 <br />Loose volume: 15,750 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourly <br />production: <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />125 feet <br />1,055.6 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />6,100 feet <br />2,650 lbs /LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 0.900 <br />(CAT HB)) <br />Dozing method: 1.000 <br />(GEN.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.