Laserfiche WebLink
FR. <br />DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WATER RESOURCES <br />March 9, 2015 <br />Mr. Andy Rodriguez, P.E. <br />Civil Resources, LLC <br />323 Fifth Street <br />P.O. Box 680 <br />Frederick, CO 80530 <br />Re: Shores Substitute Wa9kr Supply Plan (WDID 0502522) <br />Shores Gravel Pit, DRMS No. M- 1998- 0131(WDID 0505500) <br />Sections 1 and 2, T2N, R68W, 6" P.M. <br />Water Division 1, Water District 5, Weld County <br />Approval Period: January 1, 2015 through December 31, 2015 <br />Contact phone number for Mr. Andy Rodriguez: 303 - 833 -1416 <br />Dear Mr. Rodriguez: <br />John W. 1lickeriooper <br />Governor <br />Mike King <br />Executive Director <br />Dick Wolfe, P.E. <br />Director /State Engineer <br />RECEIVED <br />�/ MAR 112015 <br />DIVISION OF RECLAMATION <br />� MINING AND SAFETY <br />We have reviewed your letter dated December 13, 2014, requesting renewal of the <br />above - referenced substitute water supply plan to cover depletions caused by an existing <br />gravel mining operation, operated by Bestway Concrete Et Aggregate ( "App(icant "). The <br />required fee of $257.00 for the renewal of this substitute water supply plan has been submitted <br />(receipt no. 3667697C). The original plan was approved on May 21, 2001 and was most recently <br />approved on May 18, 2014 for operations through December 31, 2014. <br />Plan Operation <br />This plan seeks to replace depletions resulting from mining operations at the Shores <br />gravel pit. The site contains four slurry walled areas, designated cells A through D, as shown <br />on the attached Figure 1. Together these four cells are planned to eventually be connected <br />via pipelines, by others, and become Shores Lake (WDID 0503900) as adjudicated in case no. <br />2000CW83. Cells A, B, C, and D were initially dewatered and dry mined. A slurry wall was <br />constructed around cells A and B and lining for these cells was approved on January 11, 2007. <br />A slurry wall was also constructed around cell C and was approved on December 7, 2009. A <br />slurry wall was constructed around cell D and was approved on October 8, 2013. During the <br />period of this plan mining will occur in cell D until the end of February 2015. The Applicant <br />amended the gravel pit permitted boundary to include an additional 30 acres known as the <br />Burch property, which will be mined in three phases starting in March 2015. It is estimated <br />that groundwater will be encountered at the Burch property in the dewatering trenches in <br />May 2015. The depletions that result from mining operations at the Shores pit are evaporation <br />from a silt pond and dewatering trenches, concrete batching, water lost with the mined <br />product and dust suppression. The proposed replacement source is a lease with Central <br />Colorado Water Conservancy District. Accretions from past dewatering operations and the <br />new dewatering estimated to start in May 2015 at the Burch property are applied to this plan <br />against the evaporation and operational depletions at the site. <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303 -866 -3581 • Fax: 303 - 866 -3589 <br />www.water.state.co.us <br />