Laserfiche WebLink
<br />SUPPORTFACILITIES <br />-Rule 4.04: <br />- <br />current operations have been moved to the east of this area and east of the truck dump. The small crusher and <br />stockpiles basically fit within the haul road loop from the scale to the dump. <br />- There are three new stockpiles at the new crusher location. These are a stoker pile, a lump pile and a raw coal <br />pile. These piles are all much smaller than their respective piles at the old coal processing area. <br />- The fuel island area was stable at the time of the inspection. <br />- The shop/warehouse and office bench was stable at the time of the inspection. There were no problems noted in <br />this area. <br /> <br /> <br />DOCUMENTS RECEIVED: None <br /> <br /> <br />This concludes the 26 February 2015 partial inspection report for the Terror Creek Loadout <br /> <br /> <br /> <br />