Laserfiche WebLink
Tutt(e A,- Associates <br />303.653.5584 <br />PO Box 485 <br />Broomfield, CO 80038 <br />garyjtuttle(c�maiLcom <br />March 5, 2015 <br />Tim Cazier <br />,rt) DRMS <br />1313 Sherman Street <br />Room 215 MAR 10 2015 <br />Denver, CO 80203 DIVISION OF RECLAMATION <br />?,� <br />Re: M -1977 -376, Canyon Dolomite Quarry MINING AND S _ ; Y <br />Dear Tim: <br />On behalf of Continental Materials, I am requesting an extension of the CsZrt> >�� �A�tinn <br />v due date in your Inspection Report of February 11, 2, 015-fior the Technical Revision on <br />Availability of Records to June 12, 2015. <br />Our start on the mining and reclamation planning was slowed by getting me under <br />contract, researching the pre -law and post -law disturbances, and trying to retrieve aerial <br />and contour mapping done in 2007 by Sanborn Aerial which failed due to corrupted <br />electronic files. <br />Thank you for your consideration. <br />Cordially, <br />Tuttle & Associates <br />Gary Echnabel, <br />Cc: J ile <br />