My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-10_INSPECTION - C1981020
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981020
>
2015-03-10_INSPECTION - C1981020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:10 PM
Creation date
3/11/2015 7:28:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
Inspection
Doc Date
3/10/2015
Doc Name
Inspection Report
From
DRMS
To
CAM-MIning,LLC
Inspection Date
2/26/2015
Email Name
ZTT
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 26, 2015 C-1981-020/Munger Canyon Mine ZTT <br /> <br /> <br />ROADS Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3) <br />Drainage 4.03.1(4)/4.03.2(4) <br />Surfacing and Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) <br />Reclamation 4.03.1(7)/4.03.2(7): <br />The lower section of the reclaimed haul road was inspected. The area was well vegetated and stable. No issues <br />were observed. <br /> <br />REVEGETATION Rule 4.15 <br />Vegetative Cover; Timing: <br />All disturbed areas associated with reclamation have yet to be reseeded. Corey Heaps stated that once conditions <br />allow, all disturbed areas are to be reseeded with the approved reclamation seed mix. <br /> <br />SIGNS AND MARKERS Rule 4.02: <br />Disturbance markers were located along the entrance road and then along the permit boundary areas on the <br />outskirts of the canyon. <br /> <br />entrance. The signs had all information required for <br />compliance. <br /> <br />TOPSOIL Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />The remaining topsoil pile was used in the reclamation of the sediment pond. The piles footprint is still in need of <br />being reseeded once weather allows. <br /> <br /> <br /> <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br />46 <br />Page of <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.