Laserfiche WebLink
-4- <br />12. PrimaM future (Post-mining) land use check one): <br />Cropland(CR) R Pastureland(PL) General Agriculture(GA) <br />Rangeland(RL) -E] Forestry(FR) Wildlife Habitat(WL) <br />�✓ Residential(RS) R Recreation(RC) Industrial/Commercial(IC) <br />Developed Water Resources(WR) Solid Waste Disposal(WD) <br />13. Primary present land use check one : <br />Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />Rangeland (RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) IJ Industrial/Commercial(IC) <br />Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />gravel is removed via dozer, excavator, or front end loader and fed to protable crushing and screening plant <br />15. On Site Processing: l I Crushipg/$ereening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Portable Crushing and screening plant operates for app. one month per year on average <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />none <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Expansion of permitted acreage will allow for progression of mining across the permit area in <br />approximately 10 acre increments with concurrent reclamation and mining for the life of mine of <br />about 25 years at present production rates. <br />