My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-09_REVISION - M2012032 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2015-03-09_REVISION - M2012032 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:38 PM
Creation date
3/10/2015 8:45:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
REVISION
Doc Date
3/9/2015
Doc Name
Supplemental Information TR05
From
Fortune Revenue Silver Mines, Inc
To
DRMS
Type & Sequence
TR5
Email Name
RCO
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The half - culvert ditches will be removed using large equipment (e.g. 966 loader), flatbed <br />truck, and 2 personnel. The culverts will be taken to a landfill. <br />• Conex containers located east of the filter building are portable and are used for storing <br />supplies during the mining operation. They are portable and will be removed for <br />reclamation. <br />• The superstructures and foundations at each of three shaft sites will be removed. <br />For the worst case topsoil replacement, the following calculation is made: <br />Atlas area = 4.53 ac. <br />Revenue Pile area =10.21 ac — 0.35 ac for Mine water pond to be left = 9.86 ac. <br />NE rangeland area = 0.97 ac <br />SE rangeland area = 1.06 ac <br />Total: 16.42 ac <br />Using 6 inches thickness, this is an amount of 13,245 cy. Since there is 3045 cy available from the <br />Atlas pile footprint, the amount of imported soil needed is 10,200 cy. <br />This area of 16.42 acres is also the area for site seeding and mulching. <br />Since the reclamation plan does not call for the removal of all surface facilities, and the Atlas <br />waste area will not have been developed yet, related reclamation will not be necessary. A detailed <br />breakdown of each task and its associated cost is shown in Table L -1. <br />Details of main building construction details built as of September 2013 are shown below: <br />Dry Room Building <br />o 47' wide x 50' long x 28' tall "at peak" <br />Revenue Mine March 2015 L -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.