My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-04_INSPECTION - M1993080 (2)
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1993080
>
2015-02-04_INSPECTION - M1993080 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:14 PM
Creation date
3/6/2015 3:47:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993080
IBM Index Class Name
INSPECTION
Doc Date
2/4/2015
Doc Name
Inspection Report
From
DRMS
To
The Summit Pressed Brick and Tile Company
Inspection Date
2/12/2014
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task # 050 Page I of 2 <br />SCRAPER TEAM WORK <br />Task description: Spread topsoil on pit floor, 4.5 acre <br />Site: Calhan Clay Pit Permit Action: 2015 Update Permit/Job #: M1993080 <br />PROJECT IDENTIFICATION <br />Task #: 050 State: Colorado <br />Date: _2/2/2015 County: El Paso _ <br />User: TC 1 <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 623G <br />- Dozer: NA <br />Abbreviation: None <br />Filename: M080 -050 <br />COSTShift basis: 1 per day <br />iption <br />Support Equipment -Load Area: NA _ <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Cnst Rreakdnwne Scraner Wnrk Team Snnnnrt Fnninment Maintennnna Fnninment <br />Total work team cost/hour: $254.83 <br />MATERIAL OUANTITIES <br />Initial volume: 3,600 CCY Swell factor: 1.115 <br />Loose volume: 4,014 LCY <br />Source of estimated volume: Calc from mining/recl plans <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$75.81 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$140.00 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$39.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$254.83 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$254.83 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $254.83 <br />MATERIAL OUANTITIES <br />Initial volume: 3,600 CCY Swell factor: 1.115 <br />Loose volume: 4,014 LCY <br />Source of estimated volume: Calc from mining/recl plans <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,100 lbs/LCY <br />Material description: <br />Earth - Loam <br />Rated Payload: <br />55,200 pounds <br />Payload Capacity: <br />26.29 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />18.00 <br />LCY <br />Heaped Volume: <br />23.00 <br />LCY <br />Average Volume: <br />20.50 <br />LCY <br />Adjusted Capacity: <br />20.50 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.