My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-06_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2015-03-06_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:06 PM
Creation date
3/6/2015 1:07:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/6/2015
Doc Name
Cost Estimate
From
DRMS
To
Colowyo Coal Company
Type & Sequence
TR104
Email Name
RDZ
JRS
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Technical Revision 104 Cost <br />Site: Colowvo Coal Mine <br />PROJECT IDENTIFICATION <br />Permit Action: Technical <br />Revision 104 Permit/Job #: C1981019 <br />Task #: TRI04A00 State: Colorado <br />Date: 3/6/2015 County: Moffat <br />User: JRS <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C019- TRI04A00 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />TRI04AOI <br />TR104A02 <br />TR104A03 <br />Regrade ETD Pond 1 <br />DOZER <br />1 <br />1 <br />1 <br />0.81 <br />$221.00 <br />$133.00 <br />$641.00 <br />Replace Topsoil to ETD Pond 1 <br />DOZER <br />0.49 <br />Broadcast Seed ETD Pond 1 Area <br />REVEGE <br />1.00 <br />TOTAL O & P = <br />$216.48 <br />SUBTOTALS: <br />2.3 <br />$995 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02% <br />Total = <br />$20.10 <br />Performance bond: 1.05% <br />Total = <br />$10.45 <br />Job superintendent: 1.15 hrs <br />Total = <br />$86.43 <br />Profit: 10.00% <br />Total = <br />$99.50 <br />TOTAL O & P = <br />$216.48 <br />CONTRACT <br />AMOUNT (direct + O & P) = <br />$1,211.48 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and /or contract/bid preparation: <br />2.00% <br />Total = <br />$24.23 <br />Reclamation management and /or administration: <br />1.91% <br />$23.14 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$263.85 <br />TOTAL BOND AMOUNT (direct + indirect) = $1,258.85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.